Measured design and layout
We measure the room, document the existing plumbing, gas, electrical panel and vent routes, and draw the layout options. You see where the sink, range, refrigerator and island would sit before anything is ordered.
Start a projectLicensed design-build · CSLB #1162108
Keeping the sink and appliances in place is a different job from opening the kitchen to the next room. As a San Jose kitchen remodeling contractor, FORMA helps you define the layout, cabinetry, utilities and installation work to include in your proposal.
Book a free consultation
San Jose + South Bay
A kitchen remodel touches more trades than any other room in the house: demolition, framing, plumbing, electrical, ventilation, drywall, cabinetry, stone, tile, flooring and paint all have to land in the right order. FORMA Design + Build handles that as one design-build scope, so the person who helps you draw the layout is working from the same information as the crew that builds it.
We remodel kitchens across San Jose, from galley kitchens in Willow Glen bungalows to closed-off kitchens in Cambrian and Almaden ranch homes that owners want to open to the family room. Whether you are replacing cabinets in the existing footprint or moving the sink, range and walls, the work starts with a measured plan and a written scope you can compare line by line.
A connected scope
Plan before construction
Scope in detail
We measure the room, document the existing plumbing, gas, electrical panel and vent routes, and draw the layout options. You see where the sink, range, refrigerator and island would sit before anything is ordered.
Cabinet drawings are coordinated with appliance specifications, door swings and filler dimensions. We help you compare stock, semi-custom and custom lines, and plan drawers, pull-outs and pantry storage around how you cook.
Supply and drain lines, gas for the range, dedicated appliance circuits, countertop outlets and lighting circuits are roughed in and inspected before the walls are closed.
Countertops are templated after the cabinets are set so the stone fits the room as built. Backsplash tile, flooring transitions and trim are installed in a sequence that protects finished surfaces.
We plan task lighting at the counters, general lighting for the room and a range hood ducted to the exterior where the structure allows it, sized for the cooktop you select.
When the scope requires a permit, we prepare the application, schedule the city inspections and keep the approved documents on site through final sign-off.
Decisions that shape the work
Replacing cabinets in their existing positions and relocating a sink or opening a wall are different scopes. Before comparing proposals, mark the appliance locations, work surfaces and routes through the room. Ask what can stay and which changes need plumbing, electrical or structural review.
Cabinet drawings should account for appliance specifications, door swings, outlets and task lighting. Decide which items you will supply and who will confirm measurements before ordering. Ask how an unavailable product or changed selection would affect the plan.
Discuss where cooking and food storage will happen while the kitchen is unavailable. Confirm access routes, dust separation, delivery space and expected utility interruptions. Ask which decisions must be complete before demolition begins.
Design + build
A free first conversation about the room, how you use it, what is not working and the budget direction you have in mind.
We measure the kitchen and adjacent rooms and note the panel capacity, plumbing routes and any wall you want to open.
Layout options, cabinet and appliance selections and a written scope with allowances and exclusions stated plainly.
We submit for permits where required and order cabinets and long-lead items so they arrive before demolition.
Demolition, rough trades and inspections, drywall, cabinets, countertops, tile, flooring, paint and fixtures.
We walk the finished kitchen with you, complete the punch list and close out the final inspection.
Typical timeline
Most of a kitchen schedule is decided before demolition. Cabinet lead times and permit review usually take longer than any single construction task, which is why we do not remove a working kitchen until the cabinets have a confirmed delivery date.
3 to 6 weeks
Layout, cabinet drawings, appliance and finish selections.
4 to 10 weeks
Runs in parallel. Simple scopes can be permitted quickly; layout changes need plan review.
6 to 12 weeks
Longer when walls move, the panel is upgraded or concealed damage is found.
These are general planning ranges for a full kitchen remodel. Your schedule is written into the proposal once the scope and selections are known.
Permits and code
In San Jose, purely cosmetic kitchen work such as painting, replacing cabinets and countertops in place, and new flooring does not normally need a building permit. Once the project adds or relocates plumbing, gas lines, circuits, ducting or walls, permits are required. The City of San Jose Building Division issues building, plumbing, electrical and mechanical permits, and offers online permits through SJPermits for some simple residential scopes that do not change the structure.
Removing or opening a wall needs plan review, and a load-bearing wall needs engineering for the new beam and posts. California's energy code also applies to remodeled kitchens: new lighting has to be high efficacy, and newly installed circuits need the GFCI and AFCI protection the current electrical code calls for. A permitted remodel also triggers a check of smoke and carbon monoxide alarms in the home. Requirements change, so we confirm the current rules with the City of San Jose Building Division for your address before finalizing the scope.
For a property outside San Jose, the permit path is set by that city. See the South Bay cities we serve for the building department in each one.
Cost factors
Keeping the sink, range and refrigerator where they are is the single biggest way to control cost. Moving them means new drains, gas, venting and circuits, plus patching floors and ceilings.
Cabinets are usually the largest line item. Stock, semi-custom and fully custom lines differ in price, lead time and how closely they can be fitted to an older, out-of-square room.
Opening a wall to the dining or family room adds engineering, a beam, temporary shoring and plan review.
Induction ranges, double ovens and added circuits can exceed what an older panel supports. A panel or service upgrade is a separate cost and involves the utility.
Countertop material and thickness, full-height stone backsplashes, tile complexity and the appliance package move the total more than most owners expect.
Older San Jose homes can hide galvanized supply lines, ungrounded wiring or water damage under the sink. We state how concealed conditions are handled before work starts.
FORMA prices every project from a written scope after a site visit, with allowances and exclusions stated. For more detail, read Kitchen Remodel Cost in San Jose (2026).
Materials and options
Framed or frameless construction, painted or wood-veneer fronts, plywood or furniture-board boxes, and soft-close hardware. We explain what each choice changes in durability and price.
Engineered quartz, natural granite and quartzite, porcelain slab, solid surface and butcher block each behave differently with heat, staining and seams.
Ceramic and porcelain tile, natural stone, engineered hardwood and luxury vinyl plank. Flooring is chosen with the adjacent rooms in mind so transitions stay flush.
Sink material and mounting, faucet type, under-cabinet lighting, recessed or surface fixtures and dimming controls.
Gas, electric or induction cooking, counter-depth or built-in refrigeration and hood type. Specifications are locked before cabinet drawings are approved.
Before you request a proposal
Before comparing kitchen proposals, decide whether the layout will stay in place or move. Cabinet dimensions, appliance specifications and utility locations affect each other. Separate essential improvements from optional finishes, and ask what demolition, electrical, plumbing and installation work each proposal includes.
Read our home remodeling planning guide for a scope checklist, proposal questions and permit considerations.
Licensed. Bonded. Insured.
FORMA Design + Build is a design-build general contractor based at 360 S Market St, Unit 1707, San Jose, CA 95113. One team is responsible for the design, the permits and the construction, so there is no gap between what was drawn and what gets built.
California contractor license #1162108, B - General Building. Verify the license with the CSLB.
A $25,000 contractor's bond is on file with the California Contractors State License Board.
General liability coverage of $1M per occurrence and $2M aggregate, plus workers' compensation coverage.
Completed by FORMA
A whole-home renovation: a new kitchen with a large island, two remodeled bathrooms and updated living areas.




In our clients' words
★★★★★
“We recently had our kitchen remodeled by Forma Design + Build and couldn't be happier with how everything turned out... The kitchen feels completely different now, and it turned out even better than we envisioned.”
Useful starting points
Layout changes, cabinet construction, appliance requirements, countertop materials and existing plumbing or electrical conditions all affect scope. A useful estimate identifies allowances, exclusions and the work needed before finishes are installed. A project-specific review is needed before quoting a price.
Discuss how cooking, refrigeration, water access and dust separation will work during construction. Ask which areas remain accessible and how deliveries or utility interruptions will be coordinated before work starts.
Often, yes. The practical options depend on the existing structure, plumbing, electrical service and the relationship to adjacent rooms.
Key dimensions and lead times should be coordinated early so the layout, utilities and construction sequence stay aligned.
Plan on roughly 3 to 6 weeks for design and selections, 4 to 10 weeks for permits and cabinet lead time, and 6 to 12 weeks of construction for a full remodel. These are general planning ranges; moving walls, upgrading the electrical panel or finding concealed damage adds time.
Cosmetic work such as painting, flooring and replacing cabinets or countertops in place generally does not need a permit. Adding or moving plumbing, gas, electrical circuits, ducting or walls does. FORMA confirms the requirement with the City of San Jose Building Division for your address and handles the application and inspections.
Yes. FORMA Design + Build holds California contractor license #1162108 with a B - General Building classification, has a contractor's bond on file with the CSLB and carries general liability and workers' compensation coverage. You can verify the license on the CSLB website.