Layout and fixture planning
We measure the room and check clearances at the toilet, vanity and shower entry. If fixtures are moving, we confirm where the drains and vents can run before the design is finalized.
Start a projectLicensed design-build · CSLB #1162108
Replacing a vanity, converting a tub to a shower and moving fixtures are three different construction scopes. FORMA helps San Jose homeowners plan the plumbing, waterproofing, ventilation and finish work their bathroom remodel needs.
Book a free consultation
San Jose + South Bay
A bathroom is the smallest room in the house and the least forgiving. Water, steam, tight clearances and several trades meet in a few dozen square feet, and the work that determines whether the room lasts is the work you never see again: the drain slope, the waterproofing behind the tile and the fan duct in the ceiling.
FORMA Design + Build remodels hall baths, primary suites and powder rooms throughout San Jose. We plan the layout, plumbing, waterproofing, ventilation and finishes as one scope, pull the permits the work requires and build it with a single team responsible for the result. A tub-to-shower conversion, a vanity and tile update and a full reconfiguration are three different projects, and we scope each one accordingly.
A connected scope
Plan before construction
Scope in detail
We measure the room and check clearances at the toilet, vanity and shower entry. If fixtures are moving, we confirm where the drains and vents can run before the design is finalized.
Old tile, fixtures and damaged substrate are removed down to sound framing. Any rot or mold found behind a tub or shower is documented and repaired before new work begins.
The shower pan, walls, niches and bench are built as a continuous waterproof assembly and tested before tile is set. This is the part of a bathroom we refuse to shortcut.
New valves, supply and drain lines, GFCI-protected outlets, vanity and shower lighting and a dedicated circuit where the load requires one.
A quiet exhaust fan sized for the room and ducted to the exterior, with the humidity control current California code requires.
Tile layout is planned around niches, valves and edges before the first piece is set. Vanity, countertop, mirrors, glass, paint and accessories complete the room.
Decisions that shape the work
A vanity and finish update has different requirements from moving a toilet, adding a shower or rebuilding a wet area. Record what works in the existing room and where storage, movement or daily use is difficult. Layout decisions should come before final fixture orders.
Drain location, waterproofing, slope, shower entry and glass all need to work together. Ask what preparation is included beneath the tile and how existing damage will be handled if it is uncovered. Confirm dimensions before selecting a shower door or custom glass.
Discuss ventilation, task lighting and storage along with the visual finishes. If easier access is a priority, raise entry heights, clearances and potential support locations early. Feasibility depends on the room and should be reviewed before choosing products.
Design + build
A free conversation about who uses the bathroom, what is failing and what you would change if you could.
We measure, photograph and note the drain locations, the venting, the fan duct and the condition of the subfloor.
Layout, fixture and tile selections, and a written scope that states what is behind the tile as well as what is on it.
Permit application where required, and orders for the vanity, valves, tile and glass so nothing stalls the job.
Demolition, rough plumbing and electrical, inspections, waterproofing, tile, vanity, fixtures, glass and paint.
We test every fixture with you, complete the punch list and close the final inspection.
Typical timeline
A bathroom schedule depends mostly on whether fixtures move and how much tile there is. Custom shower glass is measured only after the tile is finished, so it is normally the last item installed.
2 to 4 weeks
Layout, fixtures, tile and vanity selections.
1 to 4 weeks
Often quick for a like-for-like remodel. Vanities and specialty tile can set the pace.
3 to 8 weeks
A hall bath sits at the short end; a reconfigured primary bath at the long end.
These are general planning ranges. If the home has one bathroom, tell us early so we can plan the sequence around keeping a working toilet and shower as long as possible.
Permits and code
In San Jose, replacing a vanity top, repainting or retiling a floor is generally treated as finish work that needs no permit. Replacing a tub or shower valve, moving a drain, adding circuits, installing a new exhaust fan with new ducting or altering walls does require permits from the City of San Jose Building Division. Straightforward bathroom remodels with no structural change can often be permitted quickly, and the city offers online permits through SJPermits for some of these scopes.
A permitted bathroom remodel has to meet current California standards. That includes water-conserving fixtures (state law requires older, high-flow toilets, showerheads and faucets to be replaced when a home is remodeled under permit), an exhaust fan ducted outdoors with a humidity control, tempered glass at the shower, GFCI protection at outlets and working smoke and carbon monoxide alarms in the home. We confirm current requirements with the City of San Jose Building Division for your address and include the inspections in the schedule.
For a property outside San Jose, the permit path is set by that city. See the South Bay cities we serve for the building department in each one.
Cost factors
Relocating a toilet or shower drain means opening the floor, and on a slab foundation it means cutting concrete. Keeping drains in place is the most effective cost control.
A curbless entry, a bench, multiple niches, a linear drain or a steam unit each add framing, waterproofing and tile labor.
Floor-to-ceiling tile, small mosaics, large-format porcelain and natural stone all change labor hours more than material price alone suggests.
Rotted subfloor around a toilet flange or behind an old tub surround is common in older homes and cannot be priced until it is exposed.
A custom vanity and frameless shower glass cost more and take longer than standard sizes.
Galvanized supply lines or cast-iron drains may need replacement back to a sound connection once the wall is open.
FORMA prices every project from a written scope after a site visit, with allowances and exclusions stated. For more detail, read Bathroom Remodel Cost in San Jose (2026).
Materials and options
Porcelain is dense, low-maintenance and suited to wet areas. Ceramic works well on walls. Natural stone needs sealing and more care.
Sheet membranes, liquid-applied membranes and foam board systems all work when installed to the manufacturer's method. We specify one system and follow it end to end.
Pressure-balance or thermostatic shower valves, low-flow toilets and faucets that meet California limits, and finishes that will still be available if a part needs replacing.
Furniture-style, floating or built-in vanities with quartz, solid surface or stone tops, sized to the plumbing and the door swing.
Framed, semi-frameless or frameless enclosures, plus blocking in the walls for grab bars now or later, a hand shower and a low or curbless entry where the floor structure allows it.
Before you request a proposal
Start a bathroom scope with layout, moisture control and daily use. A shower conversion can affect the drain, floor build-up, waterproofing and door clearances. Confirm these details before ordering tile or fixtures so the finished design can be built within the available space.
Read our home remodeling planning guide for a scope checklist, proposal questions and permit considerations.
Licensed. Bonded. Insured.
FORMA Design + Build is a design-build general contractor based at 360 S Market St, Unit 1707, San Jose, CA 95113. One team is responsible for the design, the permits and the construction, so there is no gap between what was drawn and what gets built.
California contractor license #1162108, B - General Building. Verify the license with the CSLB.
A $25,000 contractor's bond is on file with the California Contractors State License Board.
General liability coverage of $1M per occurrence and $2M aggregate, plus workers' compensation coverage.
Completed by FORMA
A whole-home renovation: a new kitchen with a large island, two remodeled bathrooms and updated living areas.




In our clients' words
★★★★★
“The original space was very dated, and he completely transformed it into a bright, modern bathroom... I especially appreciated being able to trust him to handle the details, which took a lot of the stress out of the renovation.”
Useful starting points
For a remodeling project, design planning starts with the bathroom layout, fixture positions, storage and lighting. Those choices guide plumbing, ventilation and waterproofing. Bring room dimensions and photos so the design and construction scope can be discussed together.
Moving fixtures, repairing concealed water damage, changing the shower layout and selecting tile or custom cabinetry can change the scope. Compare proposals by the preparation, waterproofing, ventilation and installation work included, rather than finishes alone.
Permit requirements depend on the property jurisdiction and the proposed work. Plumbing, electrical or structural changes may require review. Confirm the scope with the local building department before construction; do not assume a cosmetic update and a full remodel follow the same process.
In many homes it can. The final approach depends on drainage, waterproofing, available space and any applicable permit requirements.
The layout, plumbing fixtures and major finish direction should be established early because they influence dimensions and rough-in work.
As a general planning range, allow 2 to 4 weeks for design and selections and 3 to 8 weeks of construction. A hall bath that keeps its layout is at the short end; a reconfigured primary bath with custom glass is at the long end.
Usually, yes. If the home has a second bathroom the disruption is modest. If it is the only bathroom, tell us at the start so the work can be sequenced to keep a toilet and shower in service for as long as possible.
Free consultation